home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / spacedig / v11_2 / v11_258.txt < prev    next >
Internet Message Format  |  1991-07-08  |  13KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/Ea9Kv0m00VcJE0zU4U>;
  5.           Fri, 13 Apr 90 02:16:33 -0400 (EDT)
  6. Message-ID: <4a9KuZa00VcJE0xk5h@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Fri, 13 Apr 90 02:16:06 -0400 (EDT)
  11. Subject: SPACE Digest V11 #258
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 258
  14.  
  15. Today's Topics:
  16.           Space Shuttle Development (6 of 7)
  17.         Re: releasing data / digitized images
  18.           Space Shuttle Development (2 of 7)
  19.           Space Shuttle Development (4 of 7)
  20.            Re: Pegsat Update (Forwarded) - 04/09/90
  21. ----------------------------------------------------------------------
  22.  
  23. Date: 12 Apr 90 03:02:13 GMT
  24. From: usc!zaphod.mps.ohio-state.edu!sdd.hp.com!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@apple.com  (Wales Larrison)
  25. Subject: Space Shuttle Development (6 of 7)
  26.  
  27.  
  28.   NASA's cost data base was extensive, based upon up to 6 independent 
  29. cost analyses designs for similar systems, and very specifically 
  30. showed the differences in vehicle configuration and recurring cost 
  31. from limiting development costs. 
  32.      (Example data shown from summary contractor data...) 
  33.    [Summary Data from 3 August 1971 JSC internal report] 
  34. Grumman Concepts - all 1 1/2 stage, thrust augmented systems.
  35.  
  36.                   Expendable   Expendable     Expendable     Reuse  
  37.                   Liq Booster  Liq Booster    Solid Bstr     Orb & 
  38.                   (Reuse Cryo  Reuse Orb      Reuse Orb      Booster  
  39.                    Tanks)
  40.                   Reuse Orb
  41. DDT&E ($M)
  42.   Orbiter           2,600       2,615           2,615         2,586
  43.   Booster/SRM         153         537             338         2,724
  44.   Reuse Cryo Tanks    301
  45.   Main Engine         657         769             657           655
  46.   Flt test            651         693             664           936
  47.     Total           4,362       4,614           4,274         7,079
  48.  
  49.  
  50. Production ($M)
  51.   Orbiter             482         544             544           491
  52.   Booster/SRM       1,369       2,612           5,644         1,121
  53.   Tanks             2,259
  54.      Total          4,110       3,156           6,188         1,612
  55.  
  56. Operations            998       2,131           1,105         1,475
  57.  
  58. Total Program       9,470       9,901          11,567         9,988
  59.  
  60. Peak Annual         1,100       ?????           1,100         1,640
  61.  Funding
  62.  
  63. Direct Cost          9.82       10.26           14.66          3.23
  64.  per Flight
  65.  
  66. Note:(translating from 1971 dollars to 1990 dollars, yields a cost per 
  67. flight of           35.84       37.45           53.51         11.79 
  68. these were for a 40,000 pound payload system, and yielded a cost per 
  69. pound (1990$) of    $896        $936            $1338         $295  ). 
  70.  
  71.   NASA still had not been given the official go-ahead for shuttle 
  72. development, although the primary decision had apparently already been 
  73. made in the White House.  In a calculated measure, NASA was forced by 
  74. OMB to go through repeated attempts to reduce the Shuttle development 
  75. costs.  (Ref: Pace, Logsdon)  Casper Weinberger, Deputy Director of 
  76. the OMB, told his staff that they had a free hand to work on NASA to 
  77. reduce program costs.  Through November and December of 1971 OMB and 
  78. NASA fought over the shuttle design and configuration (despite all of 
  79. the previous contracted studies and study results).  To force NASA to 
  80. consider smaller, lower-cost shuttles, OMB kept specifying specific 
  81. designs to be evaluated by NASA, and NASA kept arguing against the 
  82. technical ability of OMB to cost-design a shuttle system. 
  83.                                                 (cont)
  84.  
  85.  
  86. --- Opus-CBCS 1.10
  87.  * Origin: Universal Electronics, Inc. (1:103/302.0)
  88. --  
  89. Wales Larrison
  90. ...!{dhw68k,zardoz,lawnet,conexch}!ofa123!Wales.Larrison                             Wales.Larrison@ofa123.FIDONET.ORG
  91. 714 544-0934 2400/1200/300
  92.  
  93. ------------------------------
  94.  
  95. Date: 12 Apr 90 16:31:56 GMT
  96. From: hplabsb!dsmith@hplabs.hp.com  (David Smith)
  97. Subject: Re: releasing data / digitized images
  98.  
  99. In article <1990Apr11.051210.12459@eagle.lerc.nasa.gov> tfabian@mars.lerc.nasa.gov (Ted Fabian) writes:
  100. >meanwhile, a bigger question is whether the capability to provide the data 
  101. >in the format that you all desire even exists...
  102. > ...
  103. >      again, given the density of the data, and the
  104. >      state of the art available today, putting something in one format
  105. >      will please some of the people, but not all.. so who picks the format??
  106. >      or are multiple copies stored in different formats??  etc. etc...
  107.  
  108. So let the originators make it available in whatever format they use,
  109. and make a description of the format available with the data.  Let those
  110. who want the pix make the format translation.
  111. -- 
  112.     David R. Smith, HP Labs    | "It is said that St. Patrick drove the
  113.     dsmith@hplabs.hp.com    | snakes out of Ireland.  They were last seen
  114.     (415) 857-7898        | selling junk bonds."  -- Johnny Carson
  115.  
  116. ------------------------------
  117.  
  118. Date: 12 Apr 90 01:47:35 GMT
  119. From: usc!zaphod.mps.ohio-state.edu!sdd.hp.com!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@apple.com  (Wales Larrison)
  120. Subject: Space Shuttle Development (2 of 7)
  121.  
  122.  
  123.   To scope this effort, there are about 100 Phase A studies awarded
  124. forevery Phase C/D, since not every conceptual idea is ever pursued.
  125. Typical Phase A studies range from $100K to $5M or so, and take up to
  126. a couple of years to complete.  Phase B studies have at least 2
  127. competitors, usually take 1-2 years to complete, and range in the $5-
  128. $50 million range.  There is usually only 1 winner of Phase C/D
  129. contracts, but the loser may be brought in later, as a "second source"
  130. or as a contractor for some parts of the overall system, if their
  131. design is superior in those areas (as was done with the F-16 and F-18)
  132.  
  133.   From the documentation I have, Space Shuttle design studies began in
  134. about 1968, with studies by MDAC of a Gemini-derived 9-12 man
  135. spacecraft ("Big-G") for resupplying a space Station.  In the heady
  136. days after the first moon landing, NASA and the administration had
  137. mapped out an overall plan for future space activities which included
  138. Space Station, a Lunar Base, Manned Mission to Mars, continued use of
  139. the Saturn-series of Rockets, and a Space Shuttle.
  140.   Ref: "America's Next Decade in Space: A Report for the Space Task
  141.        Group", NASA, Sep. 1969
  142.  
  143.   To gather more insight into what it would take to accomplish this
  144. ambitious plan for space activities, NASA began a series of Phase A
  145. and technology studies.  (It should be noted this included Phase A
  146. studies of Lunar Bases, Saturn-derived launch vehicles, Manned Mars
  147. Missions, and Space Stations, among others).  They let four Phase A
  148. contracts for "Integrated Launch and Reentry Vehicle" studies,
  149. totaling $1.8 M, in 1969.  These included:
  150.    o McDonnell-Douglas Astronautics Company (MDAC), contract NAS 9-
  151. 9204 (with LaRC) of a HL-10 body shape with a straight wing and
  152. 25,000 lb payload.
  153.    o North American Rockwell (NAR), contract NAS 9-9205, (with JSC)
  154. of a straight wing vehicle with a 50,000 lb payload.
  155.    o Lockheed Missile and Space Corporation (LMSC), contract NAS 9-
  156. 9206, (with MSFC) for a 1 1/2 stage vehicle with a double delta wing,
  157. launched in a triamese configuration.  (This is later redirected to 2
  158. stage fully reusable configuration, as the triamese proved unstable.)
  159.   o General Dynamics (GD), contract NAS 9-9207, (with MSFC), of a
  160. triamese vehicle configuration with a two-element swing wing and
  161. 50,000 pound payload.
  162.   Martin Marrieta performed a parallel study effort under company
  163. money (they had lost the Phase A competition), which followed the same
  164. schedule, of a launcher with a 36,500 pound payload called the
  165. "Spacemaster".
  166.  
  167.   In parallel, and based upon the results of these Phase A study
  168. contracts, NASA (At JSC, MSFC, and LaRC) studied a series of
  169. alternative conceptual designs and performed system sizing studies
  170. (contractually supported by MDAC), including a "DC-3 Shuttle"
  171. design supported by Vought aviation.
  172.                                         (Cont)
  173.  
  174.  
  175. --- Opus-CBCS 1.10
  176.  * Origin: Universal Electronics, Inc. (1:103/302.0)
  177. --  
  178. Wales Larrison
  179. ...!{dhw68k,zardoz,lawnet,conexch}!ofa123!Wales.Larrison                             Wales.Larrison@ofa123.FIDONET.ORG
  180. 714 544-0934 2400/1200/300
  181.  
  182. ------------------------------
  183.  
  184. Date: 12 Apr 90 01:52:35 GMT
  185. From: zaphod.mps.ohio-state.edu!sdd.hp.com!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@tut.cis.ohio-state.edu  (Wales Larrison)
  186. Subject: Space Shuttle Development (4 of 7)
  187.  
  188.  
  189.    A detailed independent economic analysis of the Shuttle program was 
  190. prepared, at the request of Congress. This was made by an outside, 
  191. non-aerospace consulting firm.  This was a pivotal step, in that it 
  192. forced NASA to identify the Shuttle as the primary means of performing 
  193. a variety of roles for NASA, DoD, and other users; and forced NASA 
  194. into a public justification of the Shuttle on near-term financial 
  195. grounds, when other reasons for such a system were more fundamental 
  196. (as part of a long term American space strategy).  NASA now had to get 
  197. DoD assurances it would use the shuttle for all its launches and began 
  198. designing to meet all DoD launch requirements.  NASA was forced to 
  199. show Congress and the Administration how any system selected would be 
  200. cheaper than any alternative launch system.  Results from this 
  201. economic analysis would be used as the rationale to "phase out" other 
  202. launch systems. 
  203.     "Economic Analyses of New Space Transportation Systems", 
  204.      Mathematica, Inc., 2 volumes, May 1971   
  205.   At this point, NASA stopped providing strategy for future space 
  206. programs, and began a long series of tactical battles focusing on 
  207. narrower and narrower budgetary battles. It had to meet strict 
  208. economic criteria imposed by OMB (who maintained an independent 
  209. shuttle system design group), and was encouraged to design a shuttle 
  210. that could "do all things and be all things" to all users to get the 
  211. maximum cost effectiveness.  This made it very difficult to accept 
  212. suggestions for smaller, less capable, and less risky shuttle systems,
  213. or to accept the added costs of parallel development programs which 
  214. could reduce technical risks. 
  215.   While the two stage fully reusable configuration was the option 
  216. offered the lowest potential cost per flight (as shown by all of the 
  217. Phase A studies), the overall cost to develop the system was attacked 
  218. by Congress and OMB.  Other options for the Space Shuttle 
  219. configuration had to be examined. 
  220.   In parallel to the Phase B contracts, Grumman and Lockheed were 
  221. given supporting contracts to study "Alternative Space Shuttle 
  222. Concepts" which included a 1 1/2 stage thrust-augmented system, a 
  223. solid booster/reusable orbiter system, reusable booster and orbiter 
  224. system, and a minimum risk fully reusable system.  This was done as 
  225. extensions to their Phase A studies, and essentially were parallel 
  226. Phase B studies to the fully reusable system selected.  Each was 
  227. funded at $14 M. 
  228.     Lockheed, contract NAS 8-26362 (with MSFC), 1970
  229.     Grumman, contract NAS 9-11160 (with MSFC), 1970
  230.  
  231.   It should be noted that numerous parallel technology studies were 
  232. being performed.  These included a foamed silica coated borosilicate 
  233. glass studied for a reusable heat shield (which offered a 10:1 weight 
  234. reduction and greatly decreased costs over metallic thermal protection 
  235. systems), reusable cryo tankage, advanced materials, and cryo engines.
  236.                                         (Cont)
  237.  
  238.  
  239. --- Opus-CBCS 1.10
  240.  * Origin: Universal Electronics, Inc. (1:103/302.0)
  241. --  
  242. Wales Larrison
  243. ...!{dhw68k,zardoz,lawnet,conexch}!ofa123!Wales.Larrison                             Wales.Larrison@ofa123.FIDONET.ORG
  244. 714 544-0934 2400/1200/300
  245.  
  246. ------------------------------
  247.  
  248. Date: 12 Apr 90 20:44:17 GMT
  249. From: ux1.cso.uiuc.edu!aries!mcdonald@iuvax.cs.indiana.edu  (Doug McDonald)
  250. Subject: Re: Pegsat Update (Forwarded) - 04/09/90
  251.  
  252. In article <MIKEMC.90Apr12123114@mustang.ncr-fc.FtCollins.NCR.com> mikemc@mustang.ncr-fc.FtCollins.NCR.com (Mike McManus) writes:
  253. >In article <3344@jato.Jpl.Nasa.Gov> baalke@mars.jpl.nasa.gov (Ron Baalke) writes:
  254. >>   being analyzed.  The two chemical release events will occur over
  255. >>   Northern Canada between April 14-28, local weather permitting.
  256. >
  257. >I've heard a lot about the planned barium (right?) release, but nothing about
  258. >why it's being done.  What is this experiment for?  Thanks!
  259. >
  260.  
  261. It is going to fog the mirror of the Hubble Space Telescope with barium
  262. so it won't work any more. Maybe the HST will be late enough to escape!
  263.  
  264. Doug McDonald>
  265.  
  266. ------------------------------
  267.  
  268. End of SPACE Digest V11 #258
  269. *******************
  270.